Installation of Multiple EV Charging Stations at Sweetwater Authority Facilities
Open Date: 06-Mar-2024
Close Date: 17-Apr-2024
Country: United States, California, San Diego County
Procurement Method: Proposal
Description:
Sweetwater Authority (Authority) is seeking a consultant to install eight (8) EV charging stations at two of the Authority’s facilities; four (4) at our Operations Center located at 744 F Street, Chula Vista, CA 91910, and four (4) at the Robert A. Perdue Water Treatment Plant located at 100 Lakeview Avenue, Spring Valley, CA 91977. All underground conduits and infrastructure will be installed by SDG&E prior to the installation of the charging stations.
The Authority encourages participation by local, small, and/or disadvantaged businesses.