Sweetwater Authority

Installation of Multiple EV Charging Stations at Sweetwater Authority Facilities

Open Date: 06-Mar-2024

Close Date: 17-Apr-2024

Country: United States, California, San Diego County

Procurement Method: Proposal

Description:

Sweetwater Authority (Authority) is seeking a consultant to install eight (8) EV charging stations at two of the Authority’s facilities; four (4) at our Operations Center located at 744 F Street, Chula Vista, CA 91910, and four (4) at the Robert A. Perdue Water Treatment Plant located at 100 Lakeview Avenue, Spring Valley, CA 91977. All underground conduits and infrastructure will be installed by SDG&E prior to the installation of the charging stations.

The Authority encourages participation by local, small, and/or disadvantaged businesses.